Harvey v Minister for Primary Industry and Resources [2024] HCA 1
A mining project may need works far from the mine itself. In this case, a proposed lease for those works attracted additional native title procedures, even though it did not authorise mineral extraction.
Why the lease mattered
Mount Isa Mines needed a new area to hold sediment dredged from a shipping channel. The channel served its McArthur River mining project. Ore concentrate travelled about 120 kilometres by road from the mine to the coastal loading facility.
The company applied for a mineral lease to build the sediment storage area on land where the appellants held native title. The dispute concerned which procedures had to be followed before the lease application could be decided. [1-6, 11-16]
Why the High Court allowed the appeal
The Full Federal Court had held that the native title holders had only the procedural rights they would have had as ordinary landowners.
The High Court unanimously disagreed. In this statutory setting, a right to mine was not limited to a right to extract minerals. It could cover a mining title authorising supporting works. [5-6, 65-74, 85-86]
The proposed storage area also qualified as an infrastructure facility. The Act’s list of facilities was not exhaustive: it included facilities within the term’s ordinary meaning. The Court did not need to decide whether the storage area fitted a particular listed category. [75-83]
Which process applied?
The lease’s sole purpose was to construct infrastructure associated with mining. That brought it within section 24MD(6B) of the Native Title Act 1993 (Cth), rather than the separate statutory right-to-negotiate process. [25-29, 40, 83]
The applicable process required notice and an opportunity to object. An objection triggered consultation about reducing the impact on native title rights and relevant access or works issues. The provision also allowed for an unresolved objection to be heard and determined by an independent person or body when its conditions were met. [28-29 and footnote 19]
The Court restrained the Minister from deciding the application until that process was completed. It did not permanently prohibit the lease or give the native title holders a veto. [84; orders 2(b)-(c)]
What to check before a decision
Mining infrastructure away from a mine can still attract native title procedures.
For a proposed project, ask your lawyer:
What exactly would the proposed lease authorise?
Which native title process applies, and why?
What must we do, and by when, to protect our rights under that process?
This decision concerned a particular mineral lease and statutory scheme. It does not mean every project connected with mining follows the same process.